Global Project Dashboard
Project profile · Livestock · Technology · Capital · Markets · Decision support
Decision & Reporting Centre
Feasibility report · Business plan · Investor memorandum · Financial model
Waste Resource · Farm Inventory
Use multiple animal categories. New projects default to USD (US dollars). Existing saved projects retain their original currency and amounts to avoid false conversions. Values are editable screening assumptions, not verified site measurements.
| Species | Animals | kg/head/day | TS fraction | VS/TS | Action |
|---|
Protected controlling reference (read-only)
Production · Technology & Products
Allocate collected manure between digestion and direct composting. Digestate solids are allocated separately to avoid double counting.
Formula guide
Collected manure = Σ(animal count × kg/head/day) × collection efficiency. VS fed = Σ(collected manure × TS × VS/TS). Biogas = VS fed sent to digestion × assumed gas yield per kg VS fed. Electricity = biogas × methane fraction × methane lower heating value × electrical efficiency × availability.
Digester volume = daily slurry volume × design HRT. The 706 m³ reference is installed working volume, not gross tank shell capacity.
Investment · Financial Screening
One-way NPV sensitivity
Indicative annual debt schedule
Markets · Buyers, Prices & Logistics
Annual commercial revenue is calculated from buyer quantity × net price × operating days. Avoid entering the same product twice.
| Product | Buyer | Quantity/day | Price/unit | Transport/unit | Action |
|---|
Formal engineering and compliance gate
STATUS: NOT ASSESSED BY THIS APP. The risk register and readiness checklist are planning aids only. Do not interpret checked boxes, calculated values or generated reports as engineering sign-off, permit approval, or authority to construct, commission or operate. Obtain independent, documented review of process design, gas/H₂S safeguards, hazardous-area equipment, pressure protection, civil integrity, digestate testing and local permits. Assign named reviewers and retain signed evidence in the controlling workbook/project records.
Risk & Compliance
Record risk severity and mitigation; completion of a checklist does not certify regulatory compliance.
Risk register
| Risk | Likelihood 1–5 | Impact 1–5 | Mitigation |
|---|
Operational safety hold point
NOT AN OPERATING AUTHORISATION. Before commissioning, start-up, confined-space entry, gas handling or electrical work, obtain documented site-specific approval from qualified personnel. Verify gas and H₂S detection, pressure protection, fire/explosion zoning, emergency isolation, confined-space procedures, operator training and applicable permits. Record evidence and responsible reviewers outside this screening app. A completed checklist does not grant permission to operate.
Operations · Daily Performance
Decision & Reporting Centre
Preliminary feasibility · Enterprise plan · Investor memorandum · Financial snapshot
Clipboard may be blocked on file:// pages. In that case, select text manually or use the download option.